Afghanistan: Salma Dam Resumes Operations as Reservoir Fills up
Apr 10, 2020
|
Afghanistan Times
View Original
Salma hydroelectric dam in Herat became fully operational on Sunday after the reservoir behind it filled with water. With water levels rising in the reservoir, two dormant turbines resumed power generation operations on Sunday, adding 25 megawatts to the grid, said Da Afghan Breshna Sherkat spokesman Wahidullah Tawhidi.